PT Sanghiang Perkasa (Kalbe Nutritionals)
Power | 1600 kWp |
Installed On | April 2022 |
Detail
Successful installation in collaboration with Aruna for the project of Sanghiang Perkasa.
Power | 1600 kWp |
Installed On | April 2022 |
Successful installation in collaboration with Aruna for the project of Sanghiang Perkasa.